Saturday, January 29, 2011

A little progress on the XJ....

New handlebars installed...check
New (lower) headlight mount installed...check
New triple trees installed...check
Headwork completed...check
new 15 3/4" shocks ordered...check
79 xs1100g standard tank ordered...check
Topend gasket kit ordered...check

Need to fabricate new sub frame, get new mirrors, get new front m/c and perch, fab new inst. cluster mount, fab new seats, fab header collector, fab tank mount, re-install head and valvetrain, and then bodywork and paint.

This is the most recent pictures of the bike as it sits. Need to do some final positioning of the tail section which will be slightly further forward than in the picture, but it is shown at the approximate ride height with the new shocks.